| A peek inside on January 30, 2007 | |
|
|
Subcontractors are working hard to keep on track. The dry wall has been installed. Painting should begin the week of Feburary 5th. |
|
|
Exterior architecture comes inside the library with brackets above the circulation desk that match the exterior of the building. |
|
|
The west side of the building (along the parking lot) will be the home of our new Children's Library. This picture show the entrance to the youth area from the circulation desk. |
|
|
This is from the circulation desk (looking towards Herrick House) This will be the main part of the library. In the back you can see the reading room. |
|
|
If you were peeking into the building from Herrick House's porch, this is what you would see. In the back is the circulation desk. |
|
|
Here is the reading room entrance way. This room will provide a quiet place to read. We also plan on using this room for special programs. |
|
|
The first door in this pictures shows the entrance to the Teen room. Followed by two group study or meeting rooms. |






